Standardization:
Consistent and uniform logging. Standard ruggedized VPC connection interface.
Reliability:
Currently 2 test towers with a 3d one foreseen for 2025. All test towers are identical and have a modular design ensuring 24/7 operation.
Speed & accuracy:
The standard hardware and test software approach enables routines for the operator resulting in higher efficiency, reduced cognitive load and minimization of errors.
Continuous improvement:
All connected automated tests benefit from the value increments. Connection to ERP is foreseen for 2025 enabling full traceability on all automated tests.


